Mining asset strategy. Then detailed plan.

Bergbau builds software for mining teams: standalone tools for the people deciding what to build, and agents that operate the packages your geologists and engineers already use. Everything runs on your own data, in your own environment.

How the work moves one asset, one set of numbers
01Your data
Public reportsBlock modelsFull datarooms
02Pathways
chosen
ore sources, plants,
logistics, products
03Optimiser
cut-off, throughput, logistics, offtake
04Planning agent
Geology agent
Design the decline to 9280 at 1:7, re-level FY27 around it.
decline designedschedule
OptimiseDesignScheduleTrade
Composite new holes at 2 m, rebuild the domain, re-estimate Au.
drillholesmodellingestimationreport
VarioModellingEstimateData
Strategic boards · executives · project managers

What should we build, and when?

Model the whole asset from whatever data you have, then compare every way it could be developed on the same basis.

Asset to decision
1
Asset in
Block models where you have them. Reports, public data or dataroom contents where you do not
2
Inventories built
First pass pit optimisations and mineable underground inventories
3
Region mapped
Ore sources, plants, product specs, infrastructure, targets
4
Pathways generated
Development, consolidation, divestment and study options
5
Costed, gated and screened
Capital, deferral, cost of delay, water, access, power, permitting
6
Decision
Which pathway, what it costs, and what it opens next
Handed to planning
The chosen scenario passes to the tactical tools
the hinge
Standalone software, and usable before a technical team is engaged.
Asset Pathways Value Chain Optimiser
Tactical mining engineers · geologists

Same software, five times the output

Describe the work in plain language. The agent runs it inside the package you already licence and hands it back where you always look.

Where the agents sit
Anthropic Cowork / Code
OpenAI ChatGPT / Codex
Microsoft Copilot Scout / GitHub
the assistant you already use
BERGBAU AGENTS
the layer we build
CAD
Scheduler
Geology
your current mine planning and geology packages
compatible with Deswik, Datamine and others
Your licence, your machine, your data, and your current assistant integrations.
Planning Agent Geology Agent
10,000+
assets with data ready to model when linked with MINEINTEL
1,300+
commands mapped across CAD, Scheduler and geology
10+
countries in use across operations and consultancies
50+
planning and geology workflows shipped and growing
Your environment
runs on the install you already have, and nothing leaves your network
In use with major and mid-tier global mining and consulting companies.
Strategic boards · executives · project managers

Standalone tools for the capital decision

No dependency on any third-party package. Built for asset and provincial strategy work, and for early stage due diligence, including before a technical team is engaged.

Asset Pathways
capital decisions
01

Models the whole mine from whatever data you have, then builds and compares the ways it could be developed.

Block models in, or text and report data where there are none
First pass open pit optimisations and mineable underground inventories
Ore sources, plants, product specifications and infrastructure in one model
Water, access, power, permitting and capital screened together
Exploration and acquisition targets tested as options
Development, consolidation, divestment and study pathways
Value Chain Optimiser
mine to market
02

Balances the chain against what the mine plan actually delivers, period by period.

Cut off grades varied by period
Plant throughput and recovery trade offs
Logistics and routing options
Product specifications and offtake terms
Bottlenecks across the chain
Value maximised against each period of the plan
Asset Pathways and Value Chain Optimiser behind
asset-pathways · porcupine.hpx · rev 4 · region
ASSET PATHWAYS Bergbau
Asset Base case Pathways Region Grounding Sources Facts and assumptions Runs
Region Porcupine District Integration Revision 4 gap overlay on Compare routes ▶ Run analysis

Layers

Our tenements
Third-party tenure
Ore sources
Processing
Exploration targets
M&A candidates
Power
Water
Rail and road
Tailings
Haulage rings
Structural controls
Prospective geology
1 : 250 000 · district view
50 km haulage radius · central mill Porcupine L. Night L. legacy tailings cover obligation NORTHRIDGE RES. 115 kV HWY 101 RAIL · 3.5 Mtpa OUR TENEMENTS SPUR REQUIRED 30 mo · US$96M 3 exploration targets TIMMINS Hoyle UG 6.2 Mt @ 5.4 g/t Borden UG 160 kt @ 4.1 g/t Pamour OP 38 Mt @ 1.1 g/t Dome pit · restart 21 Mt @ 0.9 g/t Marten deposit M&A · 30% · 14 Mt Central mill 11.5 ktpd · 78% utilised Second plant · 4 lines 7.2 Mtpa · 1 running Third-party mill · 2.0 Mtpa toll capacity available ROUTE A · 13 km current haul · base case ROUTE B · 1 km pit → second plant UTM zone 17N 20 km N

Second plant, selected

Ownerours, since FY26
Lines4, 1 running
Nameplate7.2 Mtpa total
To Pamour1 km
To central mill14 km
Power at gate115 kV, to 4.4 Mtpa
Waterconstrained, wet season
Sourcesrc-02 · p.14
Line 2 condition assessment outstanding. Refurbishment scope drives Gate 1 timing.
Gap: expansion beyond 4.4 Mtpa needs a 115 kV spur, 30 months, US$96M, no connection agreement lodged. Drawn dashed on the map.

District at a glance

Ore sources4 ours · 1 M&A · 3 targets
Processing2 ours · 1 third-party
Inside 50 km ring3 of 4 sources
Infrastructure gaps3 open
11 layers, curated local data
2 routes compared
3 required but absent features drawn
works offline · UTM zone 17N
value-chain-optimiser · porcupine.hpx · rev 4 → vco 2
VALUE CHAIN
OPTIMISER
Bergbau
Scenario Chain Mine Plant Product and logistics Run Levers Runs
Chain Route A, second plant line from Asset Pathways rev 4 gap 1.8% proven Compare to Pathways case ▶ Optimise
OPEN PIT 4.1 Mtpa
cut-off 0.42 g/t
UNDERGROUND 0.9 Mtpa
cut-off 2.10 g/t
STOCKPILE 3.2 Mt held
reclaim FY33+
PLANT, LINE 2 3.9 Mtpa
P80 118 µm
recovery 89.4%
LINE 3, REFRACTORY 0.6 Mtpa · 82%
PRODUCT doré + con
con 62% payable
MARKET rail 340 km
TC/RC terms
line thickness = tonnes · every stage carries recovery, capacity, unit cost and a step ladder
bottleneck: Line 2 classification at 3.9 Mtpa, coarsening past P80 124 µm loses more to recovery than it gains in throughput

Levers found

Grind P80132 → 118 µm
+$34M
OP cut-off0.50 → 0.42 g/t
+$41M
UG cut-off2.40 → 2.10 g/t
+$19M
Stockpile reclaimdefer to FY33
+$23M
Con payable target58 → 62%
+$16M
Rail vs road split82% rail
+$11M
Total +US$144M over the route as handed over, with every constraint honoured. Optimality gap 1.8%, proven, not a claim.

Constraints honoured

Plant classification cap · mine movement cap · UG development rate · ventilation airflow vs concurrent diesel · TSF deposition rate · rail allocation window · blend spec on arsenic · closure timing.
No constraint was relaxed to return this answer. If a case is infeasible we say which constraint binds, and we do not produce a number.
6 levers evaluated
gap 1.8%, proven bound
deterministic · same answer every run
asset-pathways · porcupine.hpx · rev 4
ASSET PATHWAYS Bergbau
Asset Base case Pathways Region Grounding Inputs Sources Runs
Pathways Porcupine District Integration Revision 4 AACE Class 5 Export board pack ▶ Run analysis
Gold US$2,400/oz flat real Discount 8% real, mid-year Currency US$ real, FY26 Royalty 2.5% NSR NPV figures are pathway totals, not increments
 
FY27
FY28
FY29
FY30
FY31
FY32
FY33
FY34
FY35
FY36
Base case as disclosed
GATE 1 · FY27 Q3
GATE 2 · FY30
GATE 3 · FY31
ALL SOURCES → CENTRAL MILL · 11.5 ktpd
DEPLETING
A · Convert second plant lines 2 + 4 · open pit re-routed NPV US$270M · capital US$225M
US$140M
CONVERT LINES 2+4
RAMP
PRODUCTION · 3.5 Mtpa open-pit feed
US$85M
DOME PIT RESTART, unlocked by freeing the mill
B · Dedicated line + refractory circuit NPV US$215M · capital US$216M
US$120M
BUILD
RAMP
PRODUCTION · recovery +2.5pp, refractory unlocked
US$96M
grid spur, required for B, 30 month lead
Future sources may not exist · risked, excluded from NPV above
EXPL TARGET · 45% · FY31+
REGIONAL M&A · 30% · FY32+
TOLL FEED · third-party mill
Studies and approvals must close before the gate they feed
plant condition
haul road permit · 18 mo · 35% refusal risk · gates A
metallurgical testwork, refractory · gates B
grid connection agreement · 30 mo
A or B, the numbers a board decides on
Base caseA · convert second plantB · dedicated line
NPV @ 8% realUS$40MUS$270MUS$215M
NPV range, Class 5 inputs-US$120M to +US$210MUS$95M to US$470MUS$45M to US$400M
IRRn/a27%21%
Growth capitalnilUS$225MUS$216M
Payback from first oren/a3.4 yrs4.1 yrs
AISCUS$1,640/ozUS$1,405/ozUS$1,470/oz
Decide byn/aSep 2027Mar 2030
Blocking gapn/ahaul permit, 35% refusalrefractory testwork absent
2 pathways, 2 exit options
3 gates set by lead time
future sources risked, excluded from NPV
preferred route → Value Chain Optimiser
Tactical mining engineers · geologists

Agents that operate the package you already licence

Runs onDeswikDatamineand more

They run inside the assistant your team already uses, so they reach whatever that assistant is already connected to, Microsoft 365 and the rest of your stack included.

Planning Agent
planning and scheduling
03

Mine design through to trade off studies: most of what a planner does, done by instruction.

Mine design, development and stope optimisation
Sequencing, levelling and constraints
Attributing, calculated fields and formulas
Block model editing and interrogation
Filters, views, legends and reports
Data analysis and trade off studies
Geology Agent
modelling and resource
04

The resource estimation workflow, step by step, on the geology side of the house.

Data validation and QAQC
Compositing and statistics
Domaining and wireframe modelling
Grade estimation and validation
Classification and reporting
Reconciliation and exports to planning
See it run a real schedule, edited by instruction
Planning Agent demonstration
Demonstration · coming shortly
How the agents work one sentence, chained operations
One request, six operations by hand: six dialogs, about two senior engineer days a month
assistant connected
You
Rebuild the FY27 schedule on the new dilution factors, re-level it, and add a TKM field for the new 5 Level crusher.
Planning agent
Opened FY27_Schedule 38,412 tasks
Edited 20 production fields dilution FY27
Added TKM_5L_Crush new column in the task grid
Re-levelling constraint set FY27
2 tasks moved crusher excavation, N2-02 bogging
Crosstab rebuilt ties to last month within 0.1%
Done.
Type your next request
Planning agent
scheduler  ·  FY27_Schedule updating
HomeTasksResourcesReportsTools View Gantt view
IdTaskStartOre t Tkm new JulAugSepOctNovDecJanFeb
▾ 5L WEST ACCESS 06 Jul41,820 1,353.1
DEV_5LW_011 5L West ore drive 06 Jul18,240 402.1
DEV_5LW_012 5L West access cuddy 22 Aug6,410 138.6
TKM_5L_CR01 5L crusher excavation 14 Oct17,170 812.4
MS_5L_CR Crusher available 20 Oct
▾ N2 STOPING BLOCK 26 Oct50,780
STP_N2-01D N2-01 drill 26 Oct
STP_N2-01B N2-01 bogging 13 Nov24,600
STP_N2-02B N2-02 bogging 26 Nov26,180
▾ 6L DEVELOPMENT 12 Oct38,370
DEV_6L_004 6L access decline 12 Oct22,900
VNT_6L_R02 6L vent rise 02 15 Dec
DevelopmentStopingServicesMoved by this run Production fields  ·  4 changed Dilution_FY27 1.08Stope_Rate 1,650TKM_5L_Crush 812.4
Your licence. Your files. Your templates and standards. The agent does the clicking. Nothing leaves the machine
Geology, same idea > Composite the 9280 drilling to 2 m, flag the outliers and list top cut candidates. > Rebuild the domain wireframes on the updated logging and report volumes by zone.
A day of one engineer several jobs at once, unattended
08091011121314151617
By hand
One task at a time
a single engineer cannot multi-task
With the agent
Level design
Stope shapes
Schedule and levelling
Crosstabs and exports
Four tasks moving through the same day instead of one. One engineer cannot multi-task, but one engineer can run several agents at once.

It uses what you already have

Your licence, your version, your files. No new platform to buy and no second source of truth.

Nothing leaves your network

It runs on your machine, against your data, inside your environment.

Built by mine planners

Twenty years underground and open pit, not a software vendor's guess at the work.

One handoff, not a re-model

The strategy and the schedule sit on the same numbers, so nobody rebuilds the case to plan it.

Access
Boards, executives, project managers

Walk through your asset with us

Bring a technical report or public data. We will show you the pathways, the gates and what each decision opens.

Mining engineers, geologists

Request your 30-day trial

We will send you the installer and the setup guide. It runs on your own licence, on your own machine. Up to 3 seats.

Something else? hello@bergbausystems.com
Where we are

Global presence

Denver
Switzerland
Perth
in use here our offices