Bergbau builds software for mining teams: standalone tools for the people deciding what to build, and agents that operate the packages your geologists and engineers already use. Everything runs on your own data, in your own environment.
How the work movesone asset, one set of numbers
01Your data
Public reportsBlock modelsFull datarooms
02Pathways
chosen
ore sources, plants, logistics, products
03Optimiser
cut-off, throughput, logistics, offtake
04Planning agent
Geology agent
Design the decline to 9280 at 1:7, re-level FY27 around it.
decline designedschedule
OptimiseDesignScheduleTrade
Composite new holes at 2 m, rebuild the domain, re-estimate Au.
drillholesmodellingestimationreport
VarioModellingEstimateData
Strategicboards · executives · project managers
What should we build, and when?
Model the whole asset from whatever data you have, then compare every way it could be developed on the same basis.
Asset to decision
1
Asset in
Block models where you have them. Reports, public data or dataroom contents where you do not
2
Inventories built
First pass pit optimisations and mineable underground inventories
assets with data ready to model when linked with MINEINTEL
1,300+
commands mapped across CAD, Scheduler and geology
10+
countries in use across operations and consultancies
50+
planning and geology workflows shipped and growing
Your environment
runs on the install you already have, and nothing leaves your network
In use with major and mid-tier global mining and consulting companies.
Strategicboards · executives · project managers
Standalone tools for the capital decision
No dependency on any third-party package. Built for asset and provincial strategy work, and for early stage due diligence, including before a technical team is engaged.
Asset Pathways
capital decisions
01
Models the whole mine from whatever data you have, then builds and compares the ways it could be developed.
Block models in, or text and report data where there are none
First pass open pit optimisations and mineable underground inventories
Ore sources, plants, product specifications and infrastructure in one model
Water, access, power, permitting and capital screened together
Exploration and acquisition targets tested as options
Development, consolidation, divestment and study pathways
Value Chain Optimiser
mine to market
02
Balances the chain against what the mine plan actually delivers, period by period.
Cut off grades varied by period
Plant throughput and recovery trade offs
Logistics and routing options
Product specifications and offtake terms
Bottlenecks across the chain
Value maximised against each period of the plan
Asset Pathwaysand Value Chain Optimiser behind
asset-pathways · porcupine.hpx · rev 4 · region
ASSET PATHWAYSBergbau
AssetBase casePathwaysRegionGroundingSourcesFacts and assumptionsRuns
RegionPorcupine District IntegrationRevision 4gap overlay onCompare routes▶ Run analysis
ScenarioChainMinePlantProduct and logisticsRunLeversRuns
ChainRoute A, second plant linefrom Asset Pathways rev 4gap 1.8% provenCompare to Pathways case▶ Optimise
OPEN PIT4.1 Mtpa cut-off 0.42 g/t
UNDERGROUND0.9 Mtpa cut-off 2.10 g/t
STOCKPILE3.2 Mt held reclaim FY33+
PLANT, LINE 23.9 Mtpa P80 118 µm recovery 89.4%
LINE 3, REFRACTORY0.6 Mtpa · 82%
PRODUCTdoré + con con 62% payable
MARKETrail 340 km TC/RC terms
line thickness = tonnes · every stage carries recovery, capacity, unit cost and a step ladder bottleneck: Line 2 classification at 3.9 Mtpa, coarsening past P80 124 µm loses more to recovery than it gains in throughput
Levers found
Grind P80132 → 118 µm
+$34M
OP cut-off0.50 → 0.42 g/t
+$41M
UG cut-off2.40 → 2.10 g/t
+$19M
Stockpile reclaimdefer to FY33
+$23M
Con payable target58 → 62%
+$16M
Rail vs road split82% rail
+$11M
Total +US$144M over the route as handed over, with every constraint honoured. Optimality gap 1.8%, proven, not a claim.
Constraints honoured
Plant classification cap · mine movement cap · UG development rate · ventilation airflow vs concurrent diesel · TSF deposition rate · rail allocation window · blend spec on arsenic · closure timing.
No constraint was relaxed to return this answer. If a case is infeasible we say which constraint binds, and we do not produce a number.
PathwaysPorcupine District IntegrationRevision 4AACE Class 5Export board pack▶ Run analysis
Gold US$2,400/oz flat realDiscount 8% real, mid-yearCurrency US$ real, FY26Royalty 2.5% NSRNPV figures are pathway totals, not increments
FY27
FY28
FY29
FY30
FY31
FY32
FY33
FY34
FY35
FY36
Base caseas disclosed
GATE 1 · FY27 Q3
GATE 2 · FY30
GATE 3 · FY31
ALL SOURCES → CENTRAL MILL · 11.5 ktpd
DEPLETING
A · Convert second plantlines 2 + 4 · open pit re-routedNPV US$270M · capital US$225M
US$140M
CONVERT LINES 2+4
RAMP
PRODUCTION · 3.5 Mtpa open-pit feed
US$85M
DOME PIT RESTART, unlocked by freeing the mill
B · Dedicated line+ refractory circuitNPV US$215M · capital US$216M
US$120M
BUILD
RAMP
PRODUCTION · recovery +2.5pp, refractory unlocked
US$96M
grid spur, required for B, 30 month lead
Future sourcesmay not exist · risked, excluded from NPV above
EXPL TARGET · 45% · FY31+
REGIONAL M&A · 30% · FY32+
TOLL FEED · third-party mill
Studies and approvalsmust close before the gate they feed
plant condition
haul road permit · 18 mo · 35% refusal risk · gates A
metallurgical testwork, refractory · gates B
grid connection agreement · 30 mo
A or B, the numbers a board decides on
Base case
A · convert second plant
B · dedicated line
NPV @ 8% real
US$40M
US$270M
US$215M
NPV range, Class 5 inputs
-US$120M to +US$210M
US$95M to US$470M
US$45M to US$400M
IRR
n/a
27%
21%
Growth capital
nil
US$225M
US$216M
Payback from first ore
n/a
3.4 yrs
4.1 yrs
AISC
US$1,640/oz
US$1,405/oz
US$1,470/oz
Decide by
n/a
Sep 2027
Mar 2030
Blocking gap
n/a
haul permit, 35% refusal
refractory testwork absent
2 pathways, 2 exit options
3 gates set by lead time
future sources risked, excluded from NPV
preferred route → Value Chain Optimiser
Tacticalmining engineers · geologists
Agents that operate the package you already licence
Runs onDeswikDatamineand more
They run inside the assistant your team already uses, so they reach whatever that assistant is already connected to, Microsoft 365 and the rest of your stack included.
Planning Agent
planning and scheduling
03
Mine design through to trade off studies: most of what a planner does, done by instruction.
Mine design, development and stope optimisation
Sequencing, levelling and constraints
Attributing, calculated fields and formulas
Block model editing and interrogation
Filters, views, legends and reports
Data analysis and trade off studies
Geology Agent
modelling and resource
04
The resource estimation workflow, step by step, on the geology side of the house.
How the agents workone sentence, chained operations
One request, six operationsby hand: six dialogs, about two senior engineer days a month
assistantconnected
You
Rebuild the FY27 schedule on the new dilution factors, re-level it, and add a TKM field for the new 5 Level crusher.
Planning agent
✓Opened FY27_Schedule 38,412 tasks
✓Edited 20 production fields dilution FY27
✓Added TKM_5L_Crush new column in the task grid
Re-levelling constraint set FY27
✓2 tasks moved crusher excavation, N2-02 bogging
✓Crosstab rebuilt ties to last month within 0.1%
✓Done.
Type your next request
Planning agent
scheduler · FY27_Scheduleupdating
HomeTasksResourcesReportsToolsViewGantt view
Id
Task
Start
Ore t
Tkm new
JulAugSepOctNovDecJanFeb
▾ 5L WEST ACCESS
06 Jul
41,820
1,353.1
DEV_5LW_011
5L West ore drive
06 Jul
18,240
402.1
DEV_5LW_012
5L West access cuddy
22 Aug
6,410
138.6
TKM_5L_CR01
5L crusher excavation
14 Oct
17,170
812.4
MS_5L_CR
Crusher available
20 Oct
▾ N2 STOPING BLOCK
26 Oct
50,780
STP_N2-01D
N2-01 drill
26 Oct
STP_N2-01B
N2-01 bogging
13 Nov
24,600
STP_N2-02B
N2-02 bogging
26 Nov
26,180
▾ 6L DEVELOPMENT
12 Oct
38,370
DEV_6L_004
6L access decline
12 Oct
22,900
VNT_6L_R02
6L vent rise 02
15 Dec
DevelopmentStopingServicesMoved by this runProduction fields · 4 changedDilution_FY27 1.08Stope_Rate 1,650TKM_5L_Crush 812.4
Your licence. Your files. Your templates and standards.The agent does the clicking.Nothing leaves the machine
Geology, same idea> Composite the 9280 drilling to 2 m, flag the outliers and list top cut candidates.> Rebuild the domain wireframes on the updated logging and report volumes by zone.
A day of one engineerseveral jobs at once, unattended
08091011121314151617
By hand
One task at a time
a single engineer cannot multi-task
With the agent
Level design
Stope shapes
Schedule and levelling
Crosstabs and exports
Four tasks moving through the same day instead of one. One engineer cannot multi-task, but one engineer can run several agents at once.
It uses what you already have
Your licence, your version, your files. No new platform to buy and no second source of truth.
Nothing leaves your network
It runs on your machine, against your data, inside your environment.
Built by mine planners
Twenty years underground and open pit, not a software vendor's guess at the work.
One handoff, not a re-model
The strategy and the schedule sit on the same numbers, so nobody rebuilds the case to plan it.
Access
Boards, executives, project managers
Walk through your asset with us
Bring a technical report or public data. We will show you the pathways, the gates and what each decision opens.
Mining engineers, geologists
Request your 30-day trial
We will send you the installer and the setup guide. It runs on your own licence, on your own machine. Up to 3 seats.